Experience · Contract assignment · 2025–present

T&I Engineer.
Saudi Aramco Yanbu Refinery.

I coordinate tank T&I activities across scope development, planning, contractor execution, field interfaces, progress control, and handover readiness.

Current portfolio
3 active tanks
Approximate combined capacity
1.15M BBL
Execution interfaces
2 contractors
Personally planning for 2027
+3 tanks

Active portfolio · September 2026. Final performance is updated at individual tank handover.

Across the T&I lifecycle

  1. FEL
  2. Scope
  3. Planning
  4. Procurement
  5. Execution
  6. QA/QC
  7. Handover

Additional responsibility · Operational Excellence

OE 4.5 — Safe Turnaround & Inspection

Formally designated SME Backup

In addition to my T&I project responsibilities, I serve as the designated Subject Matter Expert (SME) Backup for Saudi Aramco Operational Excellence Element OE 4.5 — Safe Turnaround & Inspection.

I support the primary SME and Operational Excellence team across process documentation, assessment readiness, and corrective-action follow-up.

Process assurance

Support the maintenance of OE 4.5 procedures, documentation, and compliance evidence, and help clarify element requirements for implementation.

Assessment support

Participate in assessments and OE review meetings, prepare supporting evidence, and present and explain evidence and implementation status.

Improvement follow-through

Coordinate follow-up on assigned corrective actions through closure, including implementation status and supporting closure evidence.

Selected impact within this role

Decisions and interventions.

Specific examples from this assignment.

A Schedule recovery

Rebuilding execution after a contractor withdrawal.

  • Contractor transition and field handover
  • Revised priorities and resource plan
  • Daily KPI and constraint review
In progress · handover pending

Supported a replacement-contractor transition, rebuilt execution priorities, and tracked recovery against the critical path.

View recovery story

B Field HSE control

18 findings. 100% closure.

  • 14 corrected in the same shift
  • 4 closed within 48 hours
  • Scaffold-access intervention

Raised unsafe conditions directly with contractor supervision and followed agreed corrections through field verification.

View HSE story

C Project controls

Fragmented records. One weekly view.

  • Connected status and line items
  • Key information found within seconds
  • Weekly management review

Built and maintained an Advanced Excel SES/RPO tracker and management dashboard using planner inputs.

View controls story

Responsibilities, methods & tools

Three projects progress through different phases under two contractors. I connect scope, schedule, work-front readiness, resources, inspection release, and the next activity.

Define & prepare

  • Front-End Loading and Scope of Work preparation and clarification
  • Execution basis and front-end planning for three additional tanks planned for 2027
  • Procurement, purchase requisition, and service-entry coordination

Plan & control

  • Primavera P6 schedule review and critical-path visibility
  • Two-week look-aheads and work-front readiness
  • Weighted physical progress by activity
  • Additional-work identification and control
  • Advanced Excel / Power BI for progress, cost, and execution tracking

Execute & hand over

  • Contractor manpower and resource coordination
  • Field progress monitoring and QA/QC and HSE interfaces
  • Punch-list, inspection release, and handover readiness