Technical scope
Fabrication and assembly of a 1,999-tube floating-head heat exchanger, starting from individual components and continuing through preparation, inspection, testing, and acceptance.
My contribution
I participated alongside the Olayan Descon workshop manager throughout the fabrication and assembly sequence, following component-to-equipment transitions and participating through preparation, inspection, testing, and acceptance.
Lifecycle exposure
- Component fabrication
- Assembly
- Equipment preparation
- Inspection & testing
- Acceptance
Evidence scope
The equipment scale demonstrates technical exposure. My role was participating engineer alongside the workshop manager, not project leader. Internal drawings and equipment records are not displayed.